Third generator at Norochcholai plant breaks down

Third generator at Norochcholai plant breaks down

July 15, 2017   02:33 pm

The third generator of the Norochcholai coal power plant has reportedly broken down. 

The generator has been completely shut down due to a technical snag in the steam pipeline system. 

The Ceylon Electricity Board (CEB) stated that repairs are currently being carried out in order to rectify the problem and that this is unlikely to affect the power supply. 

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

Palitha Thewarapperuma: Country bids farewell to beloved politician & 'man of the people'

Palitha Thewarapperuma: Country bids farewell to beloved politician & 'man of the people'

Election body says it cannot intervene to resolve SLFP’s infighting (English)

President pledged to nurture budding entrepreneurs through regional youth centres (English)

Ambitious program Sri Lanka embarked upon is now delivering results: IMF (English)

Former MP Palitha Thewarapperuma's final rites to be performed today (English)

LIVE🔴Ada Derana Prime Time News Bulletin 6.55 pm

LIVE🔴Ada Derana Lunch Time News Bulletin 12.00 pm

Injunction issued preventing Maithripala from functioning as SLFP chairman extended