Kaduwela-Biyagama Bridge to be closed

Kaduwela-Biyagama Bridge to be closed

May 24, 2018   05:41 pm

The bridge connecting Kaduwela and Biyagama will be closed from 10.00pm tonight to 5.00am tomorrow (25) as a precautionary measure, Police said.

Traffic had been restricted on the bridge yesterday (23) due fears over the excessive erosion of soil underneath the bridge along the Kelani River banks.

Vehicle movement along the bridge was limited to one lane yesterday, however it was later opened for traffic. 

The Road Development Authority (RDA) had dispatched a team of engineers to the location to inspect damage caused by the heavy erosion which was triggered by the adverse weather.  

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

LIVE🔴 Ada Derana 12.00 Midday News Bulletin

LIVE🔴 Ada Derana 12.00 Midday News Bulletin

Former IGP Deshabandu Tennakoon arrested (English)

Sri Lanka's Foreign Minister lauds Vietnam's dynamic development (English)

Postal workers continue strike action across the country (English)

Need a scientific and sustainable program to aid the poor - MP Dilith Jayaweera (English)

Former IGP Deshabandu Tennakoon arrested by CID over attack carried out on 'Aragalaya' protest movement

🔴LIVE | Ada Derana Prime Time News Bulletin | 2025.08.20

LIVE🔴 Ada Derana 12.00 Midday News Bulletin