Eight spill gates opened at Deduru Oya Dam

Eight spill gates opened at Deduru Oya Dam

October 5, 2018   05:45 pm

Eight spill gates of the Deduru Oya Dam have been opened due to the heavy rainfall being experienced in the area, Ada Derana reporter said.

He said that four spill gates were opened two feet each while the other two have been opened by four feet each.

People living in lowlands have been requested to remain cautious due to the opening of the dam’s spill gates.

The Meteorology Department says that the prevailing showery condition is expected to continue further over the island.

Showers or thundershowers will occur in most parts of the island during evening or night.

Heavy falls above 100 mm can be expected at some places in the Central, North-western, North-Central, Uva and Sabaragamuwa provinces and in Mannar district.

Showers or thundershowers may occur in western and southern coastal areas in the morning too.

Misty conditions can be expected at some places in the inland areas of the Western province and in Sabaragamuwa and Centralprovinces during the morning, it said.

Disclaimer: All the comments will be moderated by the AD editorial. Abstain from posting comments that are obscene, defamatory or slanderous. Please avoid outside hyperlinks inside the comment and avoid typing all capitalized comments. Help us delete comments that do not follow these guidelines by flagging them(mouse over a comment and click the flag icon on the right side). Do use these forums to voice your opinions and create healthy discourse.

Most Viewed Video Stories

Police fire water cannons at protesting medical students (English)

Police fire water cannons at protesting medical students (English)

Visa issuance delay at BIA could be act of 'sabotage' - Harin (English)

Litro Gas prices reduced (English)

Prices of fried rice, Kottu, short eats reduced - restaurant owners

LIVE🔴Ada Derana Prime Time News Bulletin 6.55 pm

Medal-winning athlete Nethmika Madushani continues meteoric rise amidst various hardships

New governors of Southern and North Western provinces sworn in (English)

System malfunction brings visa issuance to a standstill at BIA (English)